Overview
Lightning Protection places lightning masts in the drawing and checks what they protect with the rolling-sphere method of IEC 62305-3. The result lists the equipment that falls outside the protected volume, so you can add or move masts until everything is covered.
Prerequisites
Racks placed, and ideally the electrical devices too, since masts are checked against the equipment that is in the drawing.
Step-by-Step Guide
1. Set the protection level
Click Electrical sub-tab > Lightning Protection and set the IEC 62305 lightning protection level (LPL). The level fixes the rolling-sphere radius: a stricter class protects less volume per mast. LPL III is the usual level for a plant with no explicit risk-assessment result.
2. Check the mast defaults
Under Mast defaults, set Mast height (m), Pole diameter (m) and Restriction radius (m). These values are used for each new mast. No modules are placed inside the restriction radius, and at least 1 m is always kept clear around the base for the footing, the earth electrode and maintenance access.
3. Choose how the protected height is measured
- Height above each mast’s base (recommended): coverage is checked at a height above the ground each mast stands on, and each piece of equipment at its own top elevation. Leave the height empty to use the tallest rack in the drawing. This suits sloping sites.
- One absolute plane over the whole site: one elevation for everything. On sloping ground it is set by the tallest rack anywhere, so masts standing lower report a much smaller protected radius. Leave the override empty to use the highest rack top.
4. Place the masts
Click Place Masts, pick the mast positions in the drawing, and press Enter.
5. Run the coverage analysis
Click Run Coverage Analysis. The results show the mast count, the PV area protected, the Equipment not protected with a list of everything outside the protected volume, and any modelling caveats. A coverage overlay is drawn; Clear Overlay removes it. When you add, move or delete masts, run the analysis again to update the overlay.
6. Export the report
Click Export HTML or Export CSV to save the analysis for the design file.
Tips & Recommendations
- Use the list of equipment not protected to decide where the next mast goes, then run the analysis again.
- The analysis covers the rolling-sphere placement check. Earthing, down-conductor and surge protection design are not part of it.