Soil Analysis (Soil Compaction)

Overview

Soil Compaction estimates soil hardness across the selected area and what it means for piles: how easy they are to drive and how well they resist pull-out. It classifies the ground into 7 hardness classes, from softer ground where a concrete foundation may be needed to harder ground where pre-drilling is needed. Use it at proposal stage to spot areas that will cost more to pile, and to decide where to send the geotechnical team first. It does not replace site tests.


Prerequisites

Terrain in the drawing and a coordinate system (EPSG) set for the project, because the analysis uses the site’s location.

Step-by-Step Guide

1. Open the analysis

Click Civil Analysis on the PVX.AI ribbon, then go to Civil sub-tab > Analysis > Soil Compaction. The dialog shows the hardness scale and the outputs.

2. Check the coordinate system

The Coordinate System section shows the project’s system. If none is set, click Pick Coordinate System… and choose one; area selection stays disabled until you do. When the terrain came from a KML import, the system is set and shown read-only.

3. Select the area

Click Select Area in Drawing →. The dialog closes; pick a PV Area, KML boundary or closed polyline.

4. Read the results

PVX.AI draws a colour-coded hardness map on the PVXAI_SoilType layer and a breakdown table with, for each class, its colour, score, driving and pull-out rating, percentage and area, plus the total area.


Tips & Recommendations

  • Large soft areas may need longer piles or concrete foundations; large hard areas may need pre-drilling. Both change the pile cost per rack, so flag them in the proposal.
  • Compare the map with the geotechnical report once you have it, and use the report’s values for the final pile design.
  • Run it on each PV Area separately when areas are far apart, so each table describes one area.