Overview
Hydrology Analysis (formerly Drainage Analysis) reads the terrain and shows where water will flow and collect. Run it before you lay out the site, so racks, roads and equipment stay out of the drainage paths, and again after grading, because a graded surface drains differently. It maps drainage channels and flow directions, outlines subcatchments, flags transformers, racks and roads at flood risk, and colour-codes the ground for equipment placement.
Prerequisites
Terrain in the drawing, and a PV Area, KML boundary or closed polyline around the area to analyse.
Step-by-Step Guide
1. Open the analysis
Click Civil Analysis on the PVX.AI ribbon, then go to Civil sub-tab > Analysis > Hydrology Analysis. The dialog lists the outputs it will draw.
2. Select the area
Click Select Area in Drawing →. The dialog closes; pick a PV Area, KML boundary or closed polyline.
3. Read the drainage network
- Dark blue lines on the PVXAI_DrainingSystem layer are the natural drainage channels, where flow concentrates.
- Cyan lines with arrows show the direction of water flow.
- Subcatchment polygons outline each watershed, and pour-point markers show where each one drains out.
4. Check the assets at risk
The asset risk exposure table lists transformers, racks and roads that sit in flood-risk positions. Move them, or plan drainage around them, before the design goes further.
5. Place equipment on suitable ground
Suitability zones colour the ground green (suitable), yellow (caution) and red (avoid) for transformers and inverters, on their own layers, with the percentage of each reported on the command line. Put stations on green ground.
Tips & Recommendations
- Keep racks and roads clear of the dark blue channels. Where a road must cross one, plan a culvert: road generation during grading sizes culverts for you.
- Re-run the analysis after grading and compare the channels with the first run.
- For soil loss and erosion-control structures along these paths, run Erosion Controls next.