Creating Trackers: Detailed Design

Overview

Tracker vendors rarely space piles evenly: spans near the motor and the table ends are often shorter, and the motor sits in a gap of its own. In detailed design you switch the tracker’s Rack Design block to Manual and enter the pile layout in the Pile Schedule dialog, which reads like the vendor’s pile drawing from the south end to the north end.


Prerequisites

A tracker spec with the module, Basic Design, torque tube and tube extensions set, as in Creating Trackers: Simple Design. The vendor’s pile drawing.

Step-by-Step Guide

1. Switch to manual

In Tracker Settings, click the Automatic button in the Rack Design header. It changes to Manual. The new spans start from the current even spacing, so the design does not jump when you switch. A summary line shows the pile count, the total span and the trailing margin, next to a Pile Schedule button.

2. Open the Pile Schedule

Click Pile Schedule. The table runs in order along the tube:

  • Left overhang: from the frame end to pile 1. Pile 1 is the south end with the default azimuth.
  • One Pile span row per pair of piles, with the cumulative distance from pile 1.
  • Motor gap rows, and on terrain-following trackers TFT joint rows, at their real positions between spans. The After module column shows which module each gap follows; you can also type it.
  • Trailing margin (derived): what is left between the last pile and the north frame end. It is calculated, never typed.

3. Enter the vendor’s layout

  • Type each span in its Length cell, or use Set All for one value everywhere.
  • Paste distances takes a column of pile gaps from the clipboard (one per line, drawing units). The pile count follows the number of values.
  • + Pile, + Motor gap and + TFT joint add rows; Remove deletes the selected row and the arrows move it up or down.

The summary at the bottom shows the piles, the spans plus overhang against the available length, and the trailing margin. If the schedule does not fit, PVX.AI asks before keeping it.

4. Confirm and save

Click OK to apply the schedule; Cancel changes nothing. Set Underground Pile Depth and click Save.


Tips & Recommendations

  • A rigid tracker needs a real left overhang. A value of 0 is refused, because pile 1 would otherwise be anchored at the placement margin and every pile would shift.
  • Save is refused when a rigid segment would have fewer than two piles, or when a terrain-following spec has as many joints as module columns. Fix the spans or the joint count first.
  • A tracker imported from PVcase can carry its own pile ladder. The dialog says so, and that ladder stays in charge until you edit a span here.
  • Export the spec with Export in the Racks window and compare it with the vendor drawing before you place a large site.