Overview
The cut/fill map shows the earthworks contractor where to dig and where to fill. PVX.AI draws it after every earthworks run (grading, Adapt Terrain to Pile, a collision fix, BESS pad grading) and on request with Cubage Breakdown. It is a grid of coloured cells over the area that changed, with the numbers needed to set out the work.
Prerequisites
A completed earthworks run, or terrain plus a boundary to analyse with Cubage Breakdown.
Step-by-Step Guide
1. Show the map
The map is drawn on the PVXAI_CutFill layer. A grading run turns this layer off when it finishes so the drawing stays readable: turn it on in the Layer Properties Manager. To draw a fresh map for one area, go to Civil sub-tab > Earthworks > Cubage Breakdown and pick a closed boundary.
2. Read the colours
Red cells are cut (ground removed). Green cells are fill (ground added). Cells where the level changed by less than 5 mm are not drawn, so the map covers only the ground that was actually moved.
3. Read the labels
Each cell carries its volume, for example CUT = 12.40 m3 or FILL = 80.61 m3. Each grid point carries three labels to the millimetre: the change in level (for example +0.634), the new level and the original level. Every grid point is labelled, including those on the edge of the map.
4. Check the totals
The total cut and fill volumes are in the before/after table on PVXAI_Terrain_Legend_CutFill. Use them, not a sum of cell labels, for quantities.
Tips & Recommendations
- Zoom in to read the point labels. At site scale they overlap; on construction sheets, plot the area in sections.
- Turn off PVXAI_Terrain_Current while you read the map, so the terrain faces do not hide it in 3D views.
- For setting out, export the same data as a CSV with Earthworks (CSV): original level, finished level and difference at every point.
- After Reset Terrain the map, volume tables and rack pad surfaces are cleared, because they describe edits that no longer exist.