Defining DC Boxes, Inverters, and Transformers

Overview

After stringing, you define the electrical plan of a PV area in the Configuration Panel: the hierarchy, the inverter model, how many strings go to each inverter and how many inverters go to each transformer. PVX.AI then places the devices. Once they are placed, you can move or rotate any inverter, transformer or DC box with ordinary AutoCAD commands and press Adapt Devices so the design follows the drawing.


Prerequisites

Strings drawn, and a scope set in step 2 of Electrical sub-tab > Electrical Design (a PV area or selected strings).

Step-by-Step Guide

1. Open the Configuration Panel and pick the hierarchy

In step 3, click Open Configuration Panel. The Electrical Configuration window opens. Under TEMPLATE, choose String → Inverter → Transformer for string inverters, or String → DC Combiner → Inverter → Transformer for central inverters fed by DC boxes. Switching the template rebuilds the plan.

2. Choose the inverter

Under DEFAULT INVERTER, pick a Brand and Model, or filter by kW. To use a datasheet that is not in the catalog, click + and import its .OND file.

3. Set strings per inverter and inverters per transformer

The TRAFO BUDGET strip sets the ratios:

  • Max inv/trafo is the inverter-to-transformer ratio. PVX.AI derives the transformer count from it, and rates each transformer at its inverters times the inverter kW.
  • String inverters: DC/AC ratio and Str/inv are linked. Type one and the other follows. A mark warns when strings per inverter exceed the inverter’s DC inputs, or when the ratio is below 1.00 or above 1.60.
  • Central inverters: DC/AC ratio sets strings per inverter, and Max inputs/DCB sets how many strings one DC box takes, which gives the number of DC boxes per inverter.

The DESIGN SUMMARY shows DC power in scope, AC power planned and the resulting DC/AC ratio. Design temps… sets the temperatures used for the PVsyst string-sizing check.

4. Name, adjust and save the plan

Under NAMING, set the Trafo, Inverter and DC box prefixes and click Apply naming. The grid lists each transformer, inverter and DC box with its strings, DC capacity and AC power. You can change any count by hand, remove an inverter or DC box, or add a transformer; see Editing the Configuration Panel Plan by Hand. Click Save. A transformer with no inverters, or a transformer name another transformer already uses, blocks the save.

5. Place the devices

In step 4, choose Auto or Manual under Placement mode and click Place Devices. In Manual mode you place each transformer yourself, decide its strings and draw the line its inverters or DC boxes align to. The full flow is in Setting the Scope and Placing Electrical Devices.

6. Move or rotate devices, then run Adapt Devices

To shift a placed inverter, transformer or DC box, use AutoCAD’s own MOVE, grips or ROTATE on its block, one device or several. Then click Electrical sub-tab > Adapt Devices (also on the right-click menu). On a drawing with two or more PV areas, choose Pick PV areas or Whole drawing. Adapt Devices then:

  • finds every device that was moved or rotated, and writes its drawn position back into the design (for a transformer, also into its PV area’s plan);
  • moves the name label if it was left behind, and turns it after a rotation;
  • re-seats the device on the terrain when the design is draped in 3D;
  • warns, without blocking anything, when a device now stands on a road, over racks, outside its PV area, inside a transformer footprint, over another device, or within 1 m of its own inverter;
  • lists copied device blocks and leaves them out: a copy is not part of the design.

The report window counts the strings fed by the moved devices. Click Regenerate cabling there to re-cable each affected PV area. Racks under a moved transformer are not removed by this step: run Devices > Refresh Trafo Footprints first, otherwise strings under the transformer are cabled as they are.


Tips & Recommendations

  • Until you run Adapt Devices, the design still uses the old positions. Health Check flags a forgotten run as EL5, “Devices moved but not adapted”.
  • Do not use COPY to add an inverter or transformer. Add it in the Configuration Panel and place it.
  • BESS units and PCS skids are not covered by Adapt Devices yet.
  • To delete devices, use the Devices menu: Remove All Devices, Remove Transformer Group, Remove Inverter Group or Remove DC Combiner Group. Remove All Devices keeps the strings and releases them from their devices.
  • Every PV area owns its own plan, so a multi-area site can be configured and placed area by area.