Setting the Scope and Placing Electrical Devices

Overview

The Electrical Design window runs five numbered steps. This guide covers step 2, Scope, which tells PVX.AI which strings you are wiring, and step 4, Place Devices, which draws the transformers, inverters and DC boxes. It also explains where devices are seated and how strings are numbered, so you can predict the result and change it.


Prerequisites

Racks strung in step 1. For step 4, a plan saved in the Configuration Panel (step 3).

Step-by-Step Guide

1. Set the scope

Click PV Area and select a boundary to work on every string inside it, or Strings to select individual strings. The scope row shows the strings selected, their power, how many are Assigned, and No transformer: the strings connected to no transformer. Click Select next to that count to select those strings and zoom to them. Steps 3 to 5 stay hidden until a scope is set.

2. Choose the placement mode

In step 4, choose under Placement mode:

  • Auto: PVX.AI suggests transformer locations along the roads, and cabling runs by itself afterwards. The Auto Placement: Preview window lists each transformer with its strings, the tables it removes and the strings it cuts. Move shifts a transformer along its road, Skip leaves it for you to place by hand. Click Approve, or Manual Pick to place all of them yourself.
  • Manual: you place each transformer, choose its strings and draw the line its devices align to. You also assign the trenches that cables follow.

Click Place Devices. If an earlier run saved transformer locations, PVX.AI asks once whether to Resume them or start Fresh.

3. Manual: pick the transformer’s strings

Transformers are placed one at a time, each finished before the next starts. For each one, select its strings. A live counter compares your pick with the plan, for example “26/24 strings (+2)”: the plan count is a guide, not a limit. Click a picked string to drop it, or drag a window over picked strings to drop them all. Press Enter, Space, right-click or D to accept.

4. Manual: place the transformer

The cursor carries the transformer at its true size with its clearance box. Tables under the box show in red, tables lost through cut strings in orange, and the prompt states the cost and any conflict (on a road, over another transformer, outside the PV area). Within 7 m of a road edge the transformer snaps to its seat along that road; farther away it stays where you click, at 0 degrees. After the click, choose Accept (Enter), Move to aim again, or Back to release this transformer’s strings and pick them again. Racks under an accepted transformer are deleted with the strings on them.

5. Manual: set the alignment line

The menu “Inverter alignment line for trafo N” (on plans with DC boxes, “DC box alignment line for trafo N”) offers Select existing, Draw new and, when the drawing has roads, Align to nearest road. Your own line decides which end of each table the devices go to (step 7).

6. Manual: distribute strings to inverters

At “TR01 distribution [Auto/Manual]”, Auto follows the plan. Manual lets you pick the strings of each inverter with the same picker, which is how you set strings per inverter by hand. The plan follows what you pick, and the Manual Pick Changes window lists every difference. Strings nobody takes are released for the next transformer and reported. Press Esc to stop: transformers already drawn stay in place.

7. Where inverters and DC boxes are seated

  • With your own alignment line: a string inverter goes to the end of its own group’s table nearest the line, 0.2 m clear: on the table corner for fixed racks, centred just past the column end for trackers. DC boxes follow the same rule on their own strings’ tables. A blocked end passes to the next nearest.
  • With roads: string inverters and DC boxes sit at a row end of one of their own racks, road-side ends first, then the end nearest the transformer. An end is skipped if the device would leave the PV area, land on a rack, on another device or on a transformer pad.
  • Central inverters stand around their transformer, 1 m outside its footprint and 1 m apart: first on the side away from the road, then the road side, then along the road. A side blocked by a road, racks or the PV area edge is skipped.

8. How strings and devices are numbered

Inside each transformer, strings are numbered block by block between roads, row by row (Top to bottom by default, set under String numbering in the Configuration Panel), and east to west along each row; trackers follow the same rule turned 90 degrees. Each inverter takes the next run of strings in that order, and each DC box the next run of its inverter’s strings. Transformer numbers are unique across the drawing, and a new PV area continues after the numbers other areas use.


Tips & Recommendations

  • After Place Devices, a notice gives the number of strings left without a transformer. Use Select in the scope row to find them.
  • To move or turn a device afterwards, use AutoCAD MOVE or ROTATE and then Adapt Devices. See Defining DC Boxes, Inverters, and Transformers.
  • If racks under a transformer were not removed, run Devices > Refresh Trafo Footprints.
  • A new layout or Clear Racks on one PV area removes only that area’s electrical design. Other areas keep theirs.