Terrain Smoothing

Overview

Smoothing is not a separate tool. It is the Grading dialog with the Cut/Fill Ratio slider left at the centre: the site is reshaped to your slope targets as one continuous surface, and the volume of cut equals the volume of fill. Nothing is imported or hauled off site, which is why it is the default starting point for area grading.

Choose smoothing when soil should stay on site. Choose a biased ratio or Max fill height instead when one side of the balance is constrained; those are covered in Terrain Grading.


Prerequisites

Terrain in the drawing and a PV Area to grade.

Step-by-Step Guide

1. Open the Grading dialog

Click Civil Analysis on the PVX.AI ribbon, then Civil sub-tab > Earthworks > Grading.

2. Select the area and set the slope targets

Click Select Area and pick the PV Area. Enter NS Threshold Slope (%) and EW Threshold Slope (%) from your rack’s slope limits, and choose the Slope Transition Mode (Soft Slope Transition in most cases).

3. Keep the balance centred

Expand Cut/Fill Balance, set Method to Cut/Fill Ratio and leave the slider at 0. The live diagram shows the balance.

4. Run

Click OK. PVX.AI grades the area and draws the before/after table with the cut and fill volumes, which should be close to equal.


Tips & Recommendations

  • Balanced does not mean small. If the volumes are large, relax the slope targets, or switch to Adapt Terrain to Pile, which regrades only the rows that need it, as one continuous buildable surface, and leaves the rest of the site as it is.
  • Smoothing changes the ground only. Run Adapt Objects afterwards if racks are already placed.
  • The separate Leveling menu of older versions is retired. Its smoothing is this setting.
  • Smoothing of contour lines is a different thing: it is a display option in Contours & Spot Elevations and is off by default.

Related