Voltage Drop in Cabling

Overview

PVX.AI calculates voltage drop as part of cabling. There is no separate analysis to run: every time cables are generated, each cable is given the smallest cross-section that carries its current and keeps its voltage drop under your target, and the result is stored on the cable. This article explains the settings, how the size is chosen, and what the calculation does not cover.


Prerequisites

Devices placed, so that cabling can run. See DC and AC Cabling.

Step-by-Step Guide

1. Set the voltage-drop settings before cabling

Open Electrical sub-tab > Cables > Voltage Drop Settings…. The settings are saved with the drawing:

  • Standard: the list offers IEC and NEC, but sizing always follows IEC (see step 4).
  • Min cable section (mm²): the smallest size PVX.AI may choose. Default 4.
  • Material: Copper or Aluminum.
  • Desired voltage drop (%): the limit each cable must meet. Default 2.0.
  • System voltage (V): the DC voltage used when a string’s own voltage is not known. Default 1500.
  • Ampacity derating: Ambient air temp (°C), Soil temp (°C), Circuits per trench and Circuits grouped in air. The defaults (30 °C air, 20 °C soil, one circuit) are the IEC reference conditions, which means no derating.

The installation method (buried, in conduit, in free air) comes from the trench settings card in the Electrical Design panel. Change the settings, then run Regenerate Cabling so the sizes are recalculated.

2. How the current and length of each cable are found

  • String cable: the string’s MPP current (Impp). The length is the average of the + and – runs, lead-outs included. The percentage is taken against the string’s own voltage.
  • DC box to inverter: the sum of the Impp of the strings on that DC box.
  • Inverter to transformer (AC): the inverter’s rated AC current, I = P / (√3 × V × cosφ), with the inverter’s rated AC power, its nominal AC voltage and a power factor of 0.95.

Lengths are the routed lengths. With 3D Drape switched on, they follow the terrain.

3. How the size is chosen

For each cable, PVX.AI walks the standard sizes from the smallest upward, starting at your minimum section, and takes the first size that passes both tests:

  • Ampacity: the current, divided by the derating factor, must not exceed the rating in IEC 60364-5-52 for that size and installation method (Table B.52.3 for DC, two loaded conductors; Table B.52.5 for three-phase AC; XLPE insulation).
  • Voltage drop: ΔV = 2 × I × ρ / A × L for DC, and ΔV = √3 × I × ρ / A × L for three-phase AC, with the resistivity ρ of copper or aluminium at a conductor temperature of 78 °C. ΔV as a percentage of the circuit voltage must not exceed your target.

Each cable is checked on its own against the target. If no size passes, the cable is left unsized and shows N/A in the tables.

4. IEC or NEC, mm² or AWG

Voltage drop and cable sizing follow IEC: sizes are always chosen in mm² from the IEC 60364-5-52 tables. Choosing NEC in the Standard list is saved with the drawing but has no effect on the calculation. On a drawing in feet, lengths are reported in feet and every mm² size gets an approximate AWG or kcmil equivalent next to it, for example “6.0 mm² (~10 AWG)”. Check AWG sizes against NEC with your electrical engineer.

5. Read the values

Every cable stores its size, voltage drop in volts and in percent. Draw them as tables with Information > Cable Information Table, or export them with Cables (XLS). Re-read the values after any change to devices, strings or settings.


Tips & Recommendations

  • Not covered: cables beyond the transformer (MV collection to the substation), short-circuit withstand, and a cumulative drop added up across the string, DC box and inverter cables. Check these separately.
  • A tight target on long string runs pushes sizes up. Moving devices closer with Adapt Devices and regenerating the cabling shortens the runs, and with them the sizes.
  • Buried runs derate with the clearance of the trench actually drawn, so sizes match the trench that gets built.
  • Every PV area owns its own plan. Regenerate and check cabling area by area.