Grading BESS Pads, Fire Lanes and Vegetation Clearance

Overview

Every battery container and PCS skid needs a level pad, and the yard needs fire lanes and a vegetation clearance ring. The Grading step of the BESS Designer grades the pads. Fire lanes are on the Placement step and the vegetation ring on the Checks step.


Prerequisites

Terrain imported and units placed. Grade after the layout is final: regrading moves pad elevations.

Step-by-Step Guide

1. Set the pad parameters

Open the Grading step and fill in the fields. Values are saved as you type.

  • Side-slope ratio (H:V): the embankment slope around each pad, for example 3 for 3H:1V. 0 turns the surrounding blend off.
  • Max cut and Max fill: how deep or high a pad may be graded. A pad that cannot stay within them is flagged, not forced.
  • Cut/fill bias [-1,+1]: blank sets the pad at the mean terrain. Positive values favour cut (lower pad), negative values favour fill (higher pad).
  • Minimum pad elevation: an optional flood level. Pads below it are flagged in the grading and compliance reports. Blank turns the check off.

2. Grade the pads

Click Grade BESS pads. Each container and skid gets its own level pad with embankment side slopes, and the BESS Pad Grading report opens.

3. Read the grading report

There is one row per pad with Pad, Type, Pad elevation, Cut, Fill, Net, Flood and Findings, plus a totals line. Volumes are measured against the original terrain, so grading again on the same layout reports the same numbers. Re-run grades again.

4. Regenerate the fire lanes

Auto-placement draws fire lanes. After you edit the layout by hand, click Regenerate lanes on the Placement step. Old lanes in the area are replaced, not duplicated. Lane width comes from the Verifications step.

5. Draw the vegetation clearance

On the Checks step, click Vegetation. PVX.AI draws a dashed green ring at the effective clearance distance. Running it again redraws the ring.


Tips & Recommendations

  • Grading does not update by itself. After moving or adding units, click Grade BESS pads again.
  • The cut and fill layer PVXAI_BESS_Pad_CutFill is created hidden. Turn it on to inspect the earthworks.
  • Reserve pads are graded too, so the civil work is done once and you do not regrade to augment.
  • One undo reverts a whole grading run, all pads at once.
  • The bill of quantities includes a BESS pad earthworks group that matches the grading report.

Related