Overview
PVX.AI designs utility-scale battery energy storage (BESS) inside AutoCAD, either next to a PV plant or as a standalone storage site. All BESS work starts from one button: Electrical sub-tab > Electrical Design > BESS Designer. It opens a panel with eight steps that take you from the battery area to the final reports.
This guide explains what each step does and the concepts behind the sizing: coupling, fit to capacity versus maximize, and depth of discharge.
Prerequisites
A drawing with terrain, if you plan to grade battery pads. For AC-coupled storage, place the plant transformers first so each battery unit has a transformer to connect to. For DC-coupled storage, place the inverters first.
Step-by-Step Guide
1. Open the BESS Designer
Click Electrical sub-tab > Electrical Design > BESS Designer. Only one step is open at a time. A finished step shows a check mark and a one-line summary in its header, so you can see the state of the design without opening each step.
The Project power strip at the top shows the plant DC power (MWp), AC power (MW), the DC/AC ratio, the BESS power already connected, and the remaining headroom of each rated transformer. Until inverters and transformers are placed, it tells you there is no electrical design yet.
2. Work through the eight steps
- BESS Area: draw or convert the battery area and tag the surrounding exposures (buildings, lot lines, public ways, combustibles).
- Verifications: pick the fire code rule set, choose whether code errors only warn or block placement, and enter any AHJ overrides.
- Settings: choose the storage unit, its depth of discharge, placement defaults and augmentation inputs.
- Placement: fill the area automatically or place units by hand, pair PCS skids, regenerate fire lanes and manage reserve pads.
- Checks: run the code compliance check, draw noise contours and draw the vegetation clearance ring.
- Cabling & yield: generate the cabling and open the yield analysis request with the battery data filled in.
- Grading: set the pad parameters and grade a level pad under every container and PCS skid.
- Reports: open the compliance, augmentation and pad grading reports.
Each step has its own guide, linked under Related and from the other BESS articles.
3. Understand AC and DC coupling
Coupling decides where a battery connects. An AC-coupled unit connects to the nearest plant transformer, and its power adds to that transformer’s loading. A DC-coupled unit connects to the nearest inverter and shares its DC bus. You set the default in the Settings step.
Coupling is separate from the enclosure’s block type. An AC block has its power conversion system (PCS) built in. A DC block needs a separate PCS skid, which PVX.AI draws as its own object with its own footprint and pad. There is no separate BESS transformer object: AC-coupled units connect to the transformers of the electrical design.
4. Choose fit to capacity or maximize
On the Placement step, Fit to capacity places the number of units needed to reach the Target energy you type in MWh. The count is the target divided by the usable energy of one unit, rounded up. Maximize ignores the target and fills the area as far as the clearances allow.
Fit to capacity follows the energy target and the BESS area you fill. It does not read a point of connection limit or an export cap in MW. If the area is too small, PVX.AI places what fits and the preview says the target was not met. Check the resulting MW against your grid connection with the Project power strip and the transformer headroom it shows.
5. Understand depth of discharge
Usable energy is nameplate energy multiplied by depth of discharge (DoD). You set the DoD in the BESS Configuration window of the Settings step. Placement, compliance and every report use the usable value, so a lower DoD means more units for the same target.
Tips & Recommendations
- PV racks under a BESS area, battery unit or PCS skid are deleted, not hidden. A Racks removed window lists what was removed. Ctrl+Z brings them back right away; moving or deleting the battery later does not.
- The full catalog specification of each unit is stored in the drawing when it is placed, so a saved design reopens complete, also offline.
- BESS units and PCS skids are not covered by the Adapt Devices button yet. See Standalone BESS Plants and Editing a BESS Design for how to move them.
- The code rule engine advises placement. It does not certify a design. Confirm the applied rules with your Authority Having Jurisdiction (AHJ).