Creating Fixed Racks: Detailed Design

Overview

When a mounting system has uneven pile spacing, set the fixed rack’s Rack Design block to Manual and enter every pile position in the Pile Schedule dialog. The dialog is laid out like a vendor pile drawing: one table for the pile columns along the table, one for the pile rows across its depth, each with a running total. You can type the values, or paste a column of distances copied from Excel or a dimension takeoff.


Prerequisites

The module selected and the Basic Design filled in, as described in Creating Fixed Racks: Simple Design. The manufacturer’s pile drawing for the table.

Step-by-Step Guide

1. Switch to manual

In Fixed Settings, click the Automatic button in the Rack Design block header. It changes to Manual, and the automatic pile fields are replaced by Number of Pile Columns and a Pile Schedule button. The current automatic layout is kept as the starting point.

2. Set the pile counts

Set Number of Pile Rows (front to back) and Number of Pile Columns (along the table). You can also leave the counts and let a paste set them in the next step.

3. Open the Pile Schedule

Click Pile Schedule. The dialog shows two cards side by side:

  • Columns (along the table): Overhang left, then one row per span (Pile 1 → 2, Pile 2 → 3 and so on) with the running total from pile 1, then Overhang right (derived).
  • Rows (across the table depth): Distance to front pile, the row-to-row spacing (Row 1 → 2), then Distance to back pile (derived).

The right overhang and the back pile distance are always calculated from what is left of the table. You never type them; if they come out negative, the spans do not fit.

4. Enter or paste the distances

  • Type each span in its Length cell.
  • Set All applies one value to every span in that card.
  • Paste takes a column of distances from the clipboard, one per line, in drawing units. The pile count follows the number of values you pasted.

The summary line under each card shows the total, for example how much of the table width the overhang and spans use. If the spans exceed the table, the dialog says so and asks you to shorten them or reduce the pile count before confirming.

5. Confirm and set heights

Click OK to apply the schedule, or Cancel to leave the rack as it was. Back in Fixed Settings, the summary shows columns × rows = piles per rack. Set Height Bottom (low edge above ground) and Underground Pile Depth, then click Save.


Tips & Recommendations

  • Paste the dimension string straight from the vendor drawing or a spreadsheet column instead of retyping it. It is faster and avoids transcription errors.
  • A table with one pile row has no row-to-row spacing; the dialog then shows only the front distance.
  • Save each vendor variant as its own rack so you can swap between them later with Swap Rack.
  • Trackers have their own Pile Schedule with motor and joint gaps. See Torque Tube and Pile Schedule.

Related