Generating Roads During Grading

Overview

PVX.AI designs site roads as part of a grading run. The grading is done first, then roads are routed between the site entrances you pick on the graded surface, and their corridors (road, shoulders, side slopes and ditches) are graded back into it. The terrain, the roads and the earthwork volumes are therefore one consistent result, and culverts are sized where a road crosses a drainage channel.

Use this when you need the internal road network designed together with the earthworks. To draw a road along a route you already know, draw it by hand instead; see Defining Roads.


Prerequisites

Terrain in the drawing and a PV Area to grade. Know where the site entrances are. Roads are produced by the grading pass, so they are always generated together with a grading run.

Step-by-Step Guide

1. Set up the grading

Open Civil sub-tab > Earthworks > Grading, select the PV Area and set the slope targets and cut/fill balance as usual. See Terrain Grading.

2. Turn on road generation

Tick Generate roads (uses this grading’s targets). In the Adapt Terrain to Pile window the same option needs Grade the terrain first to be on.

3. Set the road width

Enter Road Width (m): the driveable width your trucks and cranes need. Shoulders and side slopes are added on top, so the corridor cleared on site is wider.

4. Review the advanced parameters (optional)

Expand Advanced Highway Parameters. The defaults suit most sites; change them when your design standard says otherwise.

  • Max Longitudinal Grade (%) and Max Cross Slope (%) are derived from the grading targets. Edit them, or click the reset arrow to restore the derived value. The longitudinal grade must be above 0 %.
  • Network style: Grid lays roads along the row direction (set by Row axis (°), derived from the site azimuth), which suits regular rack blocks. Organic lets roads follow the ground, which suits hilly sites. Tick Perimeter road for a road around the site.
  • Min Turn Radius (m) and Shoulder Width (m) for your design vehicle.
  • Typical section: cut and fill slope ratios and ditch dimensions.
  • Cost Weights: how strongly routing avoids length, earthwork, drainage crossings and lost panel area.
  • Mass haul: Swell factor and Free haul distance (m).
  • Culvert sizing: Design return period (years), Rainfall intensity (mm/hr) and Runoff coefficient (C). Leave the rainfall intensity empty to skip culvert sizing.

5. Run and pick the entrances

Click OK. At the prompt, pick one or more site entrance points and press Esc when done. The graded surface and the roads are drawn together.


Tips & Recommendations

  • Check curve labels after the run: a curve marked as a hairpin too tight for the design vehicle needs a wider bend or a different entrance.
  • Generated roads respect road-to-rack setbacks and get rounded corners at every junction.
  • Place devices after the roads: inverters and transformers are aligned to the road that serves them, and cable trenches can follow the roads.
  • Without a rainfall intensity there is no defensible pipe diameter, so PVX.AI does not guess one.